Services in UAE

Quantity takeoff and BOQ services in the UAE

MASONORA prepares quantity takeoffs and bills of quantities for UAE contractors, fit-out companies and developers. We measure to POMI, RICS NRM or the tender format, check issued quantities on remeasurable FIDIC contracts, and produce fit-out BOQs quickly for office, retail and hospitality spaces, all in metric units and the tender’s item structure.

Estimator reviewing printed construction drawings at a desk during a quantity takeoff

FORMAT FOR UAE

Units
m, m², m³, t, no.
Structure
POMI, NRM or tender BOQ
Pricing
AED, VAT shown separately
Delivery
Planned back from the submission date
Quantity Takeoff and Bill of Quantities in UAE

Why do quantities matter on remeasured contracts?

Many UAE projects use FIDIC conditions where the works are remeasured and the BOQ quantities are only an estimate. Payment follows the measured quantities, so an accurate independent takeoff helps forecast cash flow, spot items that will grow or shrink, and value variations from the start.

Do you prepare fit-out BOQs?

Yes. Fit-out tenders move quickly, often with drawings still developing. We measure partitions, ceilings, flooring, joinery, wall finishes and MEP modifications room by room, so a fit-out contractor can price the package and track changes as the design is finalized.

Can you follow a master developer’s format?

Yes. Where a master developer or main contractor issues its own BOQ template and measurement rules, our quantities follow them exactly, including their item numbering and descriptions.

How fast can a fit-out BOQ be turned around?

Fit-out tenders often allow days rather than weeks. We confirm a delivery date before starting, prioritize the trades with the highest value, and can deliver the BOQ in stages if that helps your team start pricing early. The final issue includes a change log against any interim version.

Deliverables

What you receive

The full scope, process and software are described on our quantity takeoff and bill of quantities page. Local standards for UAE are summarized on the UAE page.

  • Quantity takeoff workbook (Excel)
  • Bill of quantities by trade or work section
  • Marked-up drawings showing every measurement
  • Summary of quantities by trade
  • Assumptions, allowances and exclusions log
  • Addendum change log on revised issues
FAQ

Quantity takeoff and BOQ services in the UAE: questions answered

Do you prepare fit-out quantities?

Yes. Office, retail, restaurant and hospitality fit-outs are measured room by room by trade.

Can you check a remeasurable BOQ?

Yes. We measure independently and compare against the issued quantities so you can see which items are likely to change on remeasurement.

Do you measure to NRM?

Yes, where the tender specifies RICS NRM. Otherwise we follow POMI or the format issued with the tender.

Do you handle variations after award?

Yes. Variations are measured from revised drawings and compared with the contract BOQ for valuation.

Can you measure joinery and loose furniture?

Fixed joinery is measured by item and size from the joinery drawings. Loose furniture is usually scheduled separately as an owner or FF&E item.

CONTACT US

Drop us a line and start the conversation today

Tell us about your quantity takeoff and bill of quantities project. Share drawings, your deadline and the format you need, and a specialist will confirm scope, fee and delivery date in writing.

Response time
We respond within 24 hours
We will respond to you within 24 hours.
Get a Quote WhatsApp