What does pre-construction planning include?
Pre-construction planning sets up the project to succeed. It covers buildability reviews, a realistic baseline schedule, a procurement strategy, a cost plan aligned to the drawings, and the logistics, risk and quality plans that guide the site team. Getting this right is usually the cheapest way to save time and money.
Can you manage our schedule remotely?
Yes. Programming, cost control, procurement tracking and reporting work well remotely, with regular calls and shared registers. Where on-site presence is needed, we coordinate with your site team or local representatives and work in your time zone.
Which scheduling software do you use?
We build CPM schedules in Primavera P6 or Microsoft Project, depending on your contract and client requirements. Schedules are resource- and cost-loaded where needed and updated against progress, with delay analysis when events affect the critical path.
How do you control construction costs?
We set a cost plan that matches the drawings, then track commitments, actual costs, variations and forecasts against it every month. Because our estimators measured the project, changes can be priced quickly and checked against the original quantities.