Blog

Construction estimating and design guides

Practical, plain-language guides on quantity takeoffs, bills of quantities, tendering, measurement standards and construction design, written by the MASONORA team for contractors, subcontractors and developers.

Hands reviewing construction drawings at a desk
Estimating · 4 min read

Quantity takeoff vs bill of quantities: what’s the difference?

A takeoff measures. A BOQ describes, structures and prices. Here is where each fits in a tender, and which one your client actually needs.

City skyline with mid- and high-rise towers
Tendering · Australia · 4 min read

How to prepare a construction tender in Australia

From reading the documents to lodging the tender: the steps Australian builders follow to submit a complete, compliant price.

Angular white building against a pale sky
Architecture · BIM · 4 min read

BIM vs CAD for permit sets

Revit or AutoCAD for your next permit set? How the choice affects coordination, changes, quantities and approvals.

Open-plan office corridor with glazed meeting rooms
Pricing · 4 min read

What do construction estimating services cost?

Fixed fee, per trade, per square foot or retainer? How estimating firms price their work, and the factors that move the fee.

Brick apartment block with balconies at sunset
Estimating · 4 min read

Construction cost per square foot: how it is calculated and when to use it

Cost per square foot is the most quoted number in construction and one of the most misused. How to calculate it properly and when to trust it.

Hand marking up architectural plans with a pencil and scale rule
Estimating · USA · 4 min read

CSI MasterFormat divisions explained

Why US specifications and estimates are organized into numbered divisions, how the numbering works, and which divisions matter most to estimators.

Contemporary timber and dark-clad townhouse with courtyard entry
Estimating · UK · 4 min read

NRM1 vs NRM2: what is the difference?

Two RICS rulebooks, two stages of a project. When the UK uses NRM1 for cost planning and NRM2 for bills of quantities.

Estimator reviewing printed construction drawings at a desk during a quantity takeoff
Estimating · 4 min read

How to read a bill of quantities (BOQ)

What every section of a BOQ means, how to read an item line, and the checks to make before you price it.

Estimator measuring a printed plan with a scale rule
Estimating · Software · 4 min read

Takeoff software compared: PlanSwift, Bluebeam, On-Screen Takeoff, CostX and Revit

Five tools estimators use to measure drawings and models, what each does best, and how to choose for your trade and market.

Get a Quote WhatsApp