Quantity takeoff and BOQ services in Saudi Arabia
MASONORA provides quantity takeoffs and BOQ checking for contractors and developers in Saudi Arabia. We measure to POMI or the method of measurement in your tender, check client-issued BOQ quantities against the drawings, list discrepancies and missing items for clarification, and deliver quantities in metric units within the tender’s own item structure.
FORMAT FOR SAUDI ARABIA
- Units
- m, m², m³, t, no.
- Structure
- POMI, tender BOQ or project method
- Outputs
- Excel comparison + marked-up drawings
- Delivery
- Planned back from the submission date
Why check a client BOQ before pricing?
Saudi tenders frequently issue an unpriced BOQ prepared by the consultant. If its quantities are short, the contractor carries the risk on a lump-sum job; if they are long on a remeasured job, cash flow suffers. Measuring the drawings independently and comparing line by line shows where the BOQ is reliable and where clarifications or qualifications are needed.
How are concrete and steel reported?
Concrete is measured in cubic meters by grade and element, formwork in square meters by type, and reinforcement in tonnes by bar diameter. That matches how ready-mix plants and steel suppliers in the Kingdom quote, so quantities move straight into supplier inquiries.
Can you keep the tender item numbering?
Yes. Our quantities are mapped to the tender’s item numbers and descriptions, unchanged, so the comparison and the final priced BOQ stay compliant with the submission rules.
How do you deal with Arabic and English documents?
Tender documents in Saudi Arabia are often bilingual or partly in Arabic. We work from the English drawings, specifications and BOQ, and where key information appears only in Arabic, we flag it at the start so your team can provide a translation or confirm the intent before we measure.
What you receive
The full scope, process and software are described on our quantity takeoff and bill of quantities page. Local standards for Saudi Arabia are summarized on the Saudi Arabia page.
- Quantity takeoff workbook (Excel)
- Bill of quantities by trade or work section
- Marked-up drawings showing every measurement
- Summary of quantities by trade
- Assumptions, allowances and exclusions log
- Addendum change log on revised issues
More services in Saudi Arabia
Quantity Takeoff and Bill of Quantities in other countries
Quantity takeoff and BOQ services in Saudi Arabia: questions answered
Do you check BOQs issued by the consultant?
Yes. We measure the drawings and compare every BOQ line, listing differences and missing items for clarification.
Do you measure to POMI?
Yes, or to the method of measurement written into your tender documents.
Can you measure reinforcement from bar bending schedules?
Yes. Where bar bending schedules are issued, we take weights from them and check them against the structural drawings.
Do you work on government tenders?
Yes, we measure for public tenders and follow the BOQ format issued with the tender.
Do you measure MEP in the same BOQ?
Yes. Our MEP team measures mechanical, electrical, plumbing and fire items within the same tender BOQ structure.
Drop us a line and start the conversation today
Tell us about your quantity takeoff and bill of quantities project. Share drawings, your deadline and the format you need, and a specialist will confirm scope, fee and delivery date in writing.
- Response time
- We respond within 24 hours
- office@masonora.com
- Chat with a specialist
Thank you, there.
Your request has reached our team. A specialist will reply to within 24 hours with next steps.