Construction estimating and design services in Saudi Arabia
MASONORA supports contractors, subcontractors and developers in Saudi Arabia with bills of quantities and estimates measured to POMI or the project’s method of measurement, drawings prepared to the Saudi Building Code, structural design to SBC 301 and SBC 304, and planning, cost control and contract administration under FIDIC-based contracts. Quantities are metric and pricing is in Saudi riyals.
AT A GLANCE: SAUDI ARABIA
- Measurement
- Metric: m, m², m³, tonnes
- Currency
- Saudi riyals (SAR), VAT shown separately
- Estimate structure
- POMI, client BOQ or project method
- Common contracts
- FIDIC-based and government standard contracts
Codes, measurement and contracts in Saudi Arabia
Saudi Building Code
The SBC sets requirements across disciplines, including SBC 201 for general building, SBC 301 for loads, SBC 304 for concrete, SBC 401 for electrical, SBC 501 for mechanical and SBC 801 for fire protection.
Measurement
Bills of quantities commonly follow the Principles of Measurement (International), known as POMI, or a method of measurement written into the tender. We follow the method in your tender documents.
Contracts and tenders
Private projects commonly use FIDIC-based conditions. Public tenders follow the government procurement rules and portals, which set their own BOQ and submission formats.
Approvals
Building permits are issued through the municipal system, with civil defense requirements for fire and life safety. We confirm the submission requirements with your local consultant.
What we do for clients in Saudi Arabia
Projects we support in Saudi Arabia
How remote delivery works
- 01
Tender documents in
Send the tender BOQ, drawings and specifications, with the submission date. We confirm scope and delivery before starting.
- 02
Working week
We plan deliveries around the Sunday-to-Thursday working week and your tender deadlines.
- 03
Gulf format
Priced BOQs in the tender’s own format and item numbering, with VAT shown separately.
Can you price a client-issued BOQ?
Yes. Many Saudi tenders issue an unpriced BOQ that must be priced line by line without changing descriptions or item numbers. We check the BOQ quantities against the drawings, flag discrepancies and missing items for clarification, and price each line in the required format so your submission stays compliant.
Do you design to the Saudi Building Code?
Yes. Architectural drawings follow the relevant SBC parts, and structural design follows SBC 301 for loads and SBC 304 for concrete, with steel to the applicable SBC part. Final approval and stamping are carried out by a locally registered office where the authority requires it.
Do you support large residential developments?
Yes. Residential developments with repeated villa or apartment types are estimated per type and multiplied by the number of units, with shared infrastructure, amenities and external works priced separately. When the unit mix changes, the estimate updates without remeasuring the whole project.
Working with MASONORA in Saudi Arabia
Do you measure to POMI?
Yes, or to the method of measurement specified in your tender documents.
Can you work with Arabic and English tender documents?
We work in English. Where documents are in Arabic, tell us when you inquire and we will confirm what is needed to proceed.
Do you price in Saudi riyals?
Yes. Estimates are priced in SAR with VAT shown separately.
Do you support FIDIC contracts?
Yes. Scheduling, cost control and contract administration follow the FIDIC-based conditions used on your project.
How do I send tender documents?
Share them through a download link, email or WhatsApp. We reply within 24 hours with scope, fee and delivery date.
Drop us a line and start the conversation today
Tell us about your project. Share drawings, your deadline and the format you need, and a specialist will confirm scope, fee and delivery date in writing.
- Response time
- We respond within 24 hours
- office@masonora.com
- Chat with a specialist
Thank you, there.
Your request has reached our team. A specialist will reply to within 24 hours with next steps.