Project & Construction Management

Construction cost control and reporting services

MASONORA’s construction cost control service sets up a cost plan that matches the drawings, then tracks commitments, actual costs, variations and forecasts against it every month. Monthly cost reports show budget, committed, spent and forecast final cost by package, and changes are priced quickly from our own measured quantities.

Open-plan office corridor with glazed meeting rooms

ACHIEVEMENTS THROUGH THE YEARS

  • 600+
    Completed projects
  • 200+
    Satisfied clients
  • 3+
    Years of experience
  • 35+
    In-house experts
01Scope of work

Exactly what we measure and price

If an item you need is not listed, send the drawings anyway. We confirm what is included in writing before work starts.

Budget and cost plan

  • Cost plan by package or element
  • Reconciliation to drawings and contract sum
  • Contingency and allowance register
  • Cost coding structure
  • Cash-flow forecast

Monthly control

  • Commitments from subcontracts and orders
  • Actual costs from invoices and payments
  • Forecast final cost by package
  • Variance analysis and commentary
  • Cash-flow and earned value updates

Change management

  • Change and variation register
  • Pricing of variations from quantities
  • Early warning and potential change tracking
  • Subcontractor variation review
  • Final account support

Not included unless requested

  • Accounting, bookkeeping and payroll
  • Tax and audit advice
  • Payment certification that requires a licensed quantity surveyor in your jurisdiction
  • Legal advice on disputed variations
02Deliverables

What you receive, and in which formats

  1. 01Cost plan and coding structure
  2. 02Monthly cost report by package
  3. 03Forecast final cost with variance commentary
  4. 04Change and variation register with pricing
  5. 05Cash-flow forecast and curves
  6. 06Power BI or Excel dashboard on request
03Software & standards

Your software, your market’s standards

Standards we work to

  • PMI PMBOK practice
  • AACE scheduling guidance
  • FIDIC (Gulf and international)
  • JCT and NEC (UK)
  • AIA contracts (USA)
  • AS 4000 (Australia)
  • Primavera P6 logo
    Primavera P6
  • Microsoft Project logo
    Microsoft Project
  • Procore logo
    Procore
  • Aconex logo
    Aconex
  • Power BI logo
    Power BI
  • Microsoft Excel logo
    Microsoft Excel
Questions answered

Why reconcile the budget to the drawings?

Many budgets are built from rates per square foot or early estimates and never checked against the final drawings. When work starts, the difference shows up as overruns that look like changes but were missing from the start. We reconcile the cost plan to measured quantities before construction, so later variances are real variances.

What is in a monthly cost report?

For each package, the report shows the original budget, approved changes, current budget, committed cost, cost to date and forecast final cost, with the variance and a short explanation. A summary page shows the overall position, contingency remaining and cash-flow against forecast.

How are changes priced quickly?

Because our estimators measured the original project, a change can be priced by remeasuring only what moved and applying the agreed rates. That shortens the time between a change instruction and a priced variation, which keeps forecasts current.

How do you forecast the final cost of a package?

The forecast starts with what is already committed: the subcontract or order value plus approved variations. To that we add pending changes at their likely value, known quantity movements from remeasurement, and a risk allowance for issues that are identified but not yet priced. The forecast is reviewed every month with the package manager, so a growing gap between budget and forecast is seen while there is still room to recover it through procurement, value engineering or a change claim.

Worked example

One line of a monthly cost report

An illustrative concrete package line showing how budget, commitments and forecast combine into a variance. Values are index units, not prices.

Package forecast build-upILLUSTRATIVE
MEASURESOURCEBASISVALUE (INDEX)
Original budgetCost planReconciled to drawings100.0
Approved changesVariation registerTwo approved changes+4.0
Current budgetBudget + changesCalculated104.0
Forecast final costCommitment + pending + riskCalculated106.5
VarianceCurrent budget − forecastOver budget−2.5
Illustrative values only, shown as index points rather than currency. Real reports use your project’s figures.
Fee and turnaround

What affects the fee and delivery date

We quote every project on its scope, so there is no price list. These are the factors a specialist looks at before confirming a fixed fee and delivery date in writing.

Number of packages

More subcontract packages mean more lines to track monthly.

Change volume

Projects with frequent changes need more pricing support.

Reporting format

Lender or client templates and dashboards add set-up time.

Data access

Direct access to commitments and invoices speeds up each cycle.

05Our 5-step process

From brief to handover in five steps

  1. 01

    Brief

    Share drawings, specifications, your deadline and the format you need.

  2. 02

    Scope

    We confirm deliverables, format, fee and delivery date in writing before starting.

  3. 03

    Deliver

    The work is prepared to the agreed standard and checked by a second specialist.

  4. 04

    Review

    We walk you through the outputs and revise against your comments.

  5. 05

    Handover

    You receive native files and a clean package, ready to bid, submit or build.

06Who it is for

Built for the people who price and build

General contractors

Monthly package-level cost control on live projects.

Developers

Owner-side cost reporting and change review.

Lenders’ representatives

Clear forecast and variance reporting each month.

Subcontractors

Variation pricing and final account support.

07Why choose MASONORA

Why choose MASONORA for cost control and reporting

Measured, not guessed

Budgets reconciled to quantities our own estimators measured.

Forecasts every month

Forecast final cost and variance by package, with commentary.

Fast change pricing

Only what moved is remeasured, so variations are priced quickly.

Your codes and formats

Reports in your cost codes, templates or Power BI.

08FAQ

Cost Control and Reporting: frequently asked questions

Do you need access to our accounting system?

No, but it helps. We can work from exported commitment and invoice reports each month.

Can you report in our client’s format?

Yes. We set up the report in the format your client or lender requires.

Do you price variations?

Yes. Variations are priced from remeasured quantities and agreed rates, with a register tracking status.

Do you certify payments?

We prepare valuations and supporting quantities. Where a licensed professional must certify payment, that is done by your appointed certifier.

How is cost control priced?

Usually as a monthly fee based on the number of packages and reporting requirements. A specialist confirms the fee on your quote.

CONTACT US

Drop us a line and start the conversation today

Tell us about your cost control and reporting project. Share drawings, your deadline and the format you need, and a specialist will confirm scope, fee and delivery date in writing.

Response time
We respond within 24 hours
We will respond to you within 24 hours.
Get a Quote WhatsApp