The four common pricing models
There is no single industry price list, and the way a service is priced tells you a lot about what you will receive.
- Fixed fee per project: the firm reviews the drawings and quotes one fee for an agreed scope and delivery date.
- Per trade or division: common for subcontractors and for general contractors who only need some trades estimated.
- Per unit of area: a rate per square foot or square meter, simple to understand but blunt for unusual buildings.
- Hourly or retainer: suits ongoing work, such as a contractor who sends a steady flow of bids each month.
What drives the fee?
Size matters, but it is not the main driver. A large warehouse with repetitive bays can be quicker to measure than a small, intricate house. The factors that matter most are the number of trades and items to measure, the complexity of the geometry, how complete and consistent the drawings are, whether you need quantities only or full pricing with labor and materials, the format and level of detail required, and how tight the deadline is.
Quantities only, or priced estimates?
A takeoff that returns quantities is quicker than a fully priced estimate, which needs material prices, labor hours, equipment and the assumptions behind them. Some contractors prefer quantities only and apply their own rates, which reflect their crews and suppliers. Others want a complete number they can review and adjust. Be clear about which you need, because it changes both the fee and the usefulness of the result.
How to compare quotes from estimating firms
Two fees are only comparable if they buy the same thing. Before choosing, check what is in scope: which trades and divisions, whether MEP and sitework are included, whether marked-up drawings and an assumptions log come with the estimate, how addenda and revisions are handled, and whether a walk-through call is included. A lower fee that excludes the revisions you will certainly need is not cheaper.
Ways to keep the cost down
Send complete documents at the start, including addenda and specifications, so nothing has to be re-measured. Tell the estimator which trades you will self-perform or already have prices for, so effort goes where it adds value. Give as much notice of the bid date as you can; rush work costs more everywhere. And reuse templates: a firm that already knows your format and cost codes will deliver faster.
How MASONORA prices estimating work
We quote every project on its scope. After reviewing your drawings, a specialist confirms a fixed fee and a delivery date in writing before any work starts, and we reply to every inquiry within 24 hours. There is no obligation to proceed, and the fee does not change unless the scope does.
Questions to ask before you hire an estimator
A short conversation at the start saves surprises later. Ask which trades and divisions the fee covers, and whether MEP, sitework and general conditions are included. Ask what you will receive: a priced estimate or quantities only, marked-up drawings, an assumptions and exclusions log. Ask how revisions and addenda are handled and how quickly, which software and formats are used, and who checks the work before it is issued. Finally, ask for a sample of a similar estimate, so you can see the level of detail before you commit.
Frequently asked questions
Is a percentage-of-construction-cost fee common for estimating?
Not for estimating services. Percentage fees are more common for design and project management. Estimating is usually a fixed fee, per trade or hourly.
Do I pay for revisions?
It depends on the agreement. Ask how addenda and design changes are handled before you commit, and get it in writing.
Can I get a price before sending drawings?
A rough range is possible, but a reliable fixed fee needs the drawings, because their size, quality and complexity drive the effort.
Need this done for your project?
See our gc estimates by trade service. Send your drawings and we will confirm scope, fee and delivery date within 24 hours.
Get a Free Quote