MEP estimating services in Pakistan
MASONORA estimates electrical, plumbing, sanitary, gas and HVAC works for houses, commercial plazas, schools and hospitals in Pakistan. We count fittings, fixtures and points, measure pipes and wiring in running feet or meters, schedule equipment such as split air conditioners, pumps and solar systems, and price the package in Pakistani rupees.
FORMAT FOR PAKISTAN
- Electrical
- Point counts plus materials
- Plumbing
- Pipe by diameter and rft or m
- Pricing
- PKR
- Delivery
- Confirmed on your quote
How is electrical work estimated for a house?
House electrical work is usually counted by points: light points, fan points, socket points and AC points, each with its wiring, conduit and switches. Distribution boards, main wiring from the meter, earthing and backup provisions are measured separately. We report both the point count and the underlying materials, so contractors can price either way.
Do you include plumbing and gas?
Yes. Water supply pipework, typically PPR, and drainage pipework, typically uPVC, are measured by diameter and running length, with fixtures, water tanks, pumps and geysers counted. Gas pipework and connections are measured where shown, following the requirements of the gas utility for your area.
Can you estimate solar systems?
Yes. Where drawings or the brief include solar panels, inverters and batteries, we schedule the equipment and measure mounting, cabling and protection, so the solar package can be priced alongside the electrical works.
What about backup power?
Backup power is a normal part of building services in Pakistan. Where the brief or drawings include UPS systems, generators or solar with batteries, we schedule the equipment, measure changeover arrangements and dedicated circuits, and keep them as a separate section so the owner can compare options.
What you receive
The full scope, process and software are described on our MEP Estimates page. Local standards for Pakistan are summarized on the Pakistan page.
- Equipment schedules by system
- Linear measurements of pipe, duct, conduit and cable by size
- Fixture and device counts
- Labor hours by item and system
- Material pricing by item
- Priced RFQ packages for suppliers and subcontractors
- Marked-up drawings color-coded by system
More services in Pakistan
MEP Estimates in other countries
MEP estimating services in Pakistan: questions answered
Do you estimate electrical work by points?
Yes. Light, fan, socket and AC points are counted with their wiring and accessories.
Do you include water tanks and pumps?
Yes. Overhead and underground tanks, pumps and geysers are scheduled with their connections.
Can you estimate HVAC for commercial buildings?
Yes. Split units, VRF systems and ducted systems are scheduled and measured from the HVAC drawings.
Do you estimate solar installations?
Yes. Panels, inverters, batteries, mounting and cabling are scheduled and measured where included.
Do you estimate UPS and generator systems?
Yes. UPS units, generators, changeover switches and dedicated circuits are scheduled and measured where included.
Drop us a line and start the conversation today
Tell us about your MEP Estimates project. Share drawings, your deadline and the format you need, and a specialist will confirm scope, fee and delivery date in writing.
- Response time
- We respond within 24 hours
- office@masonora.com
- Chat with a specialist
Thank you, there.
Your request has reached our team. A specialist will reply to within 24 hours with next steps.